Skip to content
Australian Manufacturing Forum
Powered by the Australian Manufacturing Forum
Australian Manufacturing ForumAustralian Manufacturing Forum
Twitter page opens in new windowLinkedin page opens in new window
  • About Us
    • @AuManufacturing
    • Editorial Advisory Board
    • Contact
  • Manufacturing News
  • Defence Industry
  • Technology
  • Our Services
    • Find a Consultant or Supplier
    • Events
    • Value-added Services
  • Advertise
Search:
Search
  • About Us
    • @AuManufacturing
    • Editorial Advisory Board
    • Contact
  • Manufacturing News
  • Defence Industry
  • Technology
  • Our Services
    • Find a Consultant or Supplier
    • Events
    • Value-added Services
  • Advertise

Daily Archives: December 11, 2018

You are here:
  1. Home
  2. 2018
  3. December
  4. 11

Australia producing half world’s lithium, capturing 0.53% of booming lithium industry’s value

Manufacturing NewsBy Brent BalinskiDecember 11, 2018Leave a comment

The federal government is launching a strategy to increase Australia’s contribution to the lithium battery value chain, with a major foreign player expected to announce a local investment before the end of the year.

Solar boom as renewable power surges!

Manufacturing NewsBy Peter RobertsDecember 11, 2018Leave a comment

Australia is in the midst of an unprecedented engineering and construction boom in renewable energy. The Clean Energy Council reports 14.6 gigawatts of new renewable energy projects are under construction. Making conservative adjustments for average capacity factor of wind and solar production, this is equivalent to more than four times the energy output of the…

Massive pipeline project takes shape

Manufacturing NewsBy Peter RobertsDecember 11, 20181 Comment

Another 500 massive 1.8 metre diameter glass reinforced composite pipes are en route by ship from Adelaide to Townsville as part of the ambitious Haughton Pipeline Duplication Project. The second of six shipments, manufactured at RPC Group’s Adelaide factory, the Flowtite GRP pipes will make up a 36.5 kilometre pipeline from the Haughton Pump Station…

© AuManufacturing 2020
  • Privacy Policy
  • Website by Kindleman
Useful Links
Go to Top