Massive pipeline project takes shape

Another 500 massive 1.8 metre diameter glass reinforced composite pipes are en route by ship from Adelaide to Townsville as part of the ambitious Haughton Pipeline Duplication Project. The second of six shipments, manufactured at RPC Group’s Adelaide factory, the Flowtite GRP pipes will make up a 36.5 kilometre pipeline from the Haughton Pump Station…